Skip to main content

Batman Bridge Protective Coating

The Batman bridge was built in 1968 and was one of the first cable-stayed structures in the world. Located to the North of the Tamar River the Batman Bridge provides a vital link between West and East Tamar.

This structure spans over 430 metres, requiring robust protective coating from the corrosion-inducive environment below. Our abrasive blasting and painting work is conducted from a motorised gantry, purpose-built for our remedial maintenance works. In some areas, we also use scaffolding access systems to ensure safe and efficient access to hard-to-reach sections of the bridge. All protective coating is conducted in an encapsulated area to maintain environmental control and worker safety.

Batman Bridge

Learn more about our bridge remediation projects here.