The Darlington Bridge upgrade project was a $620 million development planned to protect the bridge from corrosion and degradation. The project marked an important stage in the delivery of Adelaide’s North-South corridor and will add on an extra (approximately) 3.3km to the existing Main South Road.

In this Australian and State Government funded project, McElligotts is proud to have been contracted to install protective coating across selected surfaces and structures. In alignment with our values here at McElligotts, the project focused on using Australian approved and manufactured components.

Roads and bridges are constantly exposed to the harsh elements and vibrations from vehicle movements and therefore are threatened by corrosion and degradation. Repairing a bridge from corrosion can be incredibly expensive, up to billions of dollars, so it is important to appropriately protect the structure from the elements. One of the two main ways to protect a bridge from corrosion is to isolate the structure from the environment with a protective coating. For this project, we were responsible for applying the protective corrosion-resistant coating to the steel box girders present on three of the eight bridges. Each of the 22 bridge girders, weighing 1300 tonnes in total, were abrasive blasted and painted to Class Sa2½, producing an even textured surface to support long-term adhesion.

Darlington Bridget Painting South Australia

The Challenge:

Of course, no project is complete without some material and weather challenges. As the bridge was not yet constructed, it made sense to have painting conducted on beams before they were erected. Therefore, each girder was delivered to our facility to be profiled, primed and coated, which meant that lack of space was a challenge we had to overcome. We also found the large sections of the girders made it challenging to maintain a ‘wet edge’, which meant we continually had to adjust our materials to extend the drying time of each coating layer. In some cases, alternative techniques like thermal spray aluminium were considered to enhance corrosion resistance in high-risk zones. In addition, the length of the project meant that some of the coating work took place during the Tasmanian winter, a less than ideal climate for applying coating. In order to meet deadlines, we had to adjust our work schedule to reduce the amount of heating required to apply the paint.

Overall, the Darlington Bridge Painting project was a challenging, yet rewarding job that tested our skills and gave us the opportunity to problem solve. The project also saw us work with some of the largest components we have ever worked with which was pretty exciting.

Learn more about our bridge remediation projects here.

projects

Darlington Bridge Painting

The Darlington Bridge upgrade project was a $620 million development planned to protect the bridge from corrosion and degradation. The…
Refurbishment work on Unit 1 of the Wivenhoe Pumped Storage Hydroelectric Power Station Wivenhoe Spiral Casing 3
South Australia

Wivenhoe Dam Unit 1 Refurbishment 

McElligotts Queensland were contracted by Queensland Government-owned energy generator and retailer, CleanCo Queensland, to provide refurbishment work to Unit 1…
Completion of the West Gate Bridge repainting, applying 55,000 litres of paint to 60,000 square metres of steel on this iconic Melbourne structure.
South Australia

West Gate Bridge Project Completion: Repainting and Protective Coating by McElligotts

After three years of dedicated work, McElligotts is proud to announce the completion of the West Gate Bridge repainting and…