NACAP RAAF Base
McElligotts conducted this job in two parts. Firstly, working on the foundation of what would soon be the base of two tanks. The concrete base was track blasted and then stripe coated with the work being completed throughout the night where temperatures suited. After a short break the team returned for stage 2. Two new
Read More…